Weymouth Rededicates Lovell Field After $6.5 Million Parks Reconstruction
WEYMOUTH — September 14, 2018 — Weymouth rededicated Lovell Memorial Field in East Weymouth after a $6.5 million reconstruction that turned a deteriorated complex into a multi-sport facility. Mayor Robert Hedlund said the project began with a roughly $12 million Activitas design that was trimmed to $6.5 million through in-house revisions by Recreation and Parks Director Steve Riley and Facilities Manager John McLeod, funded entirely within the town's existing capital budget without a debt exclusion. The same ceremony rededicated Francis "Jabber" Slattery Field, a baseball diamond on the same grounds, and unveiled a commemorative plaque for Civil War veteran Colonel Benjamin Starks Lovell, whose family donated the land. South Shore Health System sponsored a "Story Walk" literacy installation along the new playground. Hedlund disclosed the town is in early discussions with the state on a further, unspecified addition to the complex.
Keep reading with a 14-day free trial
Subscribe to The Weymouth MA Post to keep reading this post and get 14 days of free access to the full post archives.
A subscription gets you:
- Subscriber-only posts and full archive
- Post comments and join the community
- 24x7 access to local news